About

We rehearse before you do

Node Core Hub started as a small Batista do Sul studio shipping facilitation templates to product teams tired of slide-only training. Today we still prototype every module with live mentors—not contractors reading scripts.

Show, then script

Demonstrations precede worksheets so teams can feel timing before copying it.

Operational honesty

We publish what is excluded from tuition and where external reviewers should step in.

Local cadence

BRT-friendly live windows with async capture for hybrid squads.

Bench

Alternating profiles — hover glow is pure CSS, bios stay short on purpose.

Portrait tile for Helena Prado

Agile coach

Helena Prado

Designs cohort diagnostics and keeps facilitation feedback blunt but humane.

Portrait tile for Iago Mendes

Scrum mentor

Iago Mendes

Owns planning labs and dependency language for engineering-heavy squads.

Portrait tile for Luã Carvalho

Facilitation reviewer

Luã Carvalho

Scores retros for follow-through quality, not sticky-note volume.

Portrait tile for Priya Nascimento

Program coordinator

Priya Nascimento

Routes calendars, invoices, and mentor pairings without losing context.

Portrait tile for Otávio Silveira

Agile coach

Otávio Silveira

Pairs metrics with qualitative safety checks for ops reviews.

Portrait tile for Noah Azevedo

Facilitation reviewer

Noah Azevedo

Trains internal reviewers to calibrate feedback without shutting teams down.

Portrait tile for Soraia Lins

Scrum mentor

Soraia Lins

Builds role-play heavy cohorts for scrum masters under stakeholder heat.

Portrait tile for Maitê Duarte

Program coordinator

Maitê Duarte

Keeps PO intensives on schedule and surfaces syllabus changes early.

Portrait tile for Renan Vilela

Agile coach

Renan Vilela

Coaches engineering managers on micro-interventions that do not hijack teams.

Timeline

  1. 2022

    First facilitation reviewer guild

    Internal reviewers piloted scorecards now used in Facilitation Reviewer Track.

  2. 2024

    Public cohort launch

    Opened Batista-track cohorts with bilingual materials and BRT-first scheduling.

  3. 2025

    Expanded async mentor feedback

    Added voice-note critiques for planning and retro simulations.